Capabilities and Experience
|
HYBRID
COMBUSTION TURBINE CYCLES
Combustion Turbine in caes
ApplicatioNS

Conceptual Diagram for
Combustion Turbine with CAES Hybrid Cycle (Patent
Pending)
Hybrid
Plant Operations and Benefits:
- The CT-Derived Hybrid Plant Allows the Most Cost Effective:
-
- Base load operation with best efficiency
- Doubling of base load output to meet peak power demand
- CT-Based Plant Mostly Operates at Design Point with Best Efficiency
- Peak Load Generation Relies on Air from Ground‑Level Pressure Vessels
- Intermediate Load Operation, Based on System Economics and Requirements, May be Provided by:
- Using stored air, similar to peak load operation
- Using both stored and compressed air, similar to base load operation
- Ground Level Storage in Standard Piping (or a Pressure Vessel) Costs $22-30/kW/Hour-of-Storage; Two Hours of Storage Costs $45‑60/kW