Power Augmentation of the General Electric Combustion Turbines with Humid Air Injection (HAI) and Dry Air Injection (DAI)

Predicted Power Augmentation of GE PG7241 (FA) CT with HAI and DAI

(@Sea Level, 95F, 60% RH )

  CT-Humid Air Injection CT-Humid Air Injection CT-Dry Air Injection Simple CT
Total Moisture % of Air to Combustor 7.5 5.5 - -
Net Power, MW 182.6 177 166.4 150.4
Net Heat Rate, Btu/kWh (LHV) 9,160 9,380 9,720 9,760
Incremental Power, MW 32.2 26.6 16.0 Base
Incremental Heat rate, Btu/kWh 6,360 7,230 9,345 Base




Predicted Power Augmentation of GE PG7121 (EA) CT with HAI and DAI

(@Sea Level, 95F, 60% RH )

  CT-Humid Air Injection CT-Humid Air Injection CT-Dry Air Injection Simple CT
Total Moisture % of Air to Combustor 11.0 9.0 - -
Net Power, MW* 106.2 103.9 88.6 74.3
Net Heat Rate, Btu/kWh (LHV) 9,380 9,440 10,640 9,760
Incremental Power, MW 31.9** 29.6** 14.3** Base
Incremental Heat rate, Btu/kWh 8,495 8,640 15,210 Base

** Restricted by the assumed compressor surge margin


Back to Top

Contact:
Dr. Rodney R. Gay
Dr.
Michael Nakhamkin

Telephone:
(805) 686-4500
(908) 658-4815

Fax:
(805) 686-5154
(908) 658-4429

E-Mail:
RodneyGay @ ESPCinc.com
Mnakhamkin @ ESPCinc.com